Truck and Robot
-
Watching the Action -
Assessing the Progress -
Robot Connections -
Easy Robot Storage -
Reel Guide -
Scott Gayman -
SR125 -
Ready for Work -
Watching the Action -
On Site and Ready to Start the Day -
Truck set up for a day of work -
Inspection of power unit -
SR125 Robot -
Heading Off to Work in March on the East Coast of U.S. -
Robot Cuts in Cinder Block -
Team Demo at CWEA Conference -
Robot Test -
Stretching Out the Hoses -
On the Job -
Assessing the Job -
Workers Prepping Robot During a Manhattan Winter Day -
Robot Ready for Deployment -
SR160 -
SR125 tool head -
Custom Built Centering Rig for Vertical Pipe -
Robot Maintenance -
Deep in the Subway Tunnels of New York -
Calcium Tiles
On the Job
-
Natural Mineral Build up -
2″ Thick Calcite -
Calcite Cleaning -
Large Concrete Piece for Testing -
Robot Portage -
Lowering the Robot -
Working Under Freeway -
Workers on job -
Prepping the Worksite -
200′ Below Manhattan -
Robot with concrete removed from sewer pipe -
Buckets of Calcium -
Buckets of Calcium -
Concrete Catch -
Into the Tunnels Under the East River -
Hard at work in the San Diego sun -
Working at the bay -
Roots used to require the digging up of pipes for proper control -
Fred Horne and his first sewer root control machine -
Scattergram -
Root growth in 8″ VCP